|
Job Site: Culpeper Street (project #5)
![]() Leary School Job Site project completed in 1997 - Culpeper Street The next house, located across the street from the previous two homes, was started in September 1994 and took three full school years to complete to allow for as much student participation as possible. This house was a replica of the third house, with only minor changes. Again with three bedrooms, this house has two and a half baths. The kitchen in this home has an island, along with a pass through from the kitchen to the dining room. The roof style was also changed from the previous home and a porch was added to the front to give it a distinctive look. |